The Environmental Engagement
1990- IPLOM realizes a plastic wall in defence of the Scrivia stream pebbly riverbank. A concrete and bentonite wall, with inside a sheet in HDPE (plastic), able to completely isolate the refinery ground from the Scrivia riverbank averting occasional spilling.
1995 - We realized the cogeneration system considering the energy conservation and for a more rational use of energy.
1997 - We realized the Catalytic hydrotreatment system for the desulphurization of diesel and fuel oil.
1999 - IPLOM is the first refinery in Italy realizing a system to monitor the emissions. Called PEMS (Predictive Emission Monitoring System), it is connected to the weather forecast local stations and to the plant control room. It can estimate the fallout of the chimney stack emissions on the ground, according to the local orographic map.
1999 – We bring “zero emission” in the Crane bunker, to block the fetid emission coming from the Virgin Naphtha pump.
2003 – Installation of automatic skimming system for every cold water treatment system in the refinery and in Boccarda bunker.
2004 - We bring in the ozonization plant of the processing waters.
2004 – Carbon dioxide recycling plant with 3’000 kg/h warehouse capacity.
2006 – Increase of the amino scrubbing system of the refinery gas.

top